After evacuating an AC system, should i open the high side port on the shrader valve (closing the high side port) when charging? The reason I ask is if I'm weighing the R134a going into the system from a scale (30 oz in my case). If the high pressure port is closed (shrader open) Im actually charging the red high pressure line of the gauge manifold.