What I can tell you now is, the depth of the beams are either 10 inch, and/or 12 in. Thickness of flanges is something I'll have to measure yet, as well as the width of the flanges. What the proposal is, is the spacings for the rafters and poles, are to be 8' on center. Perlins would be 2x4s standing on edge, 2ft on center. The poles to be used are to be railroad rails. I am assuming that a person can heat the rails up to approx 400* to weld the beams to them. (Metalurgists can correct me on this please). The span of each rafter will be 30 ft. total width of building is 60 ft. Tin roofing material for covering. In the center of the building, there will run a much larger beam to which the rafters will be welded to. The plan is to have a trolly on this beam as well. I will measure the center beam as well and post that also.
I am certain that standing the rails on end and keeping them level, while cementing, is going to be one of the hardest things to do.
Basically, the reason for using this material is that it is, ( for lack of a better word), "free". As it has been laying in my yard for several years.
I also realize that those beams laying on their sides will not even hold up their own weight. however when held on edge, they will hold much more. Thus the hidden equation. And , maybe TowPro is right, it may not be feasable at all. I know that it will take more time to do than working with wood, but, I always seem to have more time than money. And probably have very little of either, who knows.
Well, I don't want to wear anyones eyes out on one post, so I will wait for more responses, and post more measurements later.
BTW, I really want to thank all who reply. Stay warm!