Here I am

Engine/Transmission (1998.5 - 2002) Glacier Installation

Attention: TDR Forum Junkies
To the point: Click this link and check out the Front Page News story(ies) where we are tracking the introduction of the 2025 Ram HD trucks.

Thanks, TDR Staff
Status
Not open for further replies.
I just got the glacier kit with the 3/8 in lines and the question i have is if I am suppose to replace all the old fuel lines including the metal lines at the front or the rubber lines only. Thanks in advance

Clayton
 
Did you read the instructions? You will have to cut the metal line the feed line from the tank. You need to trace that line back from the oem filter so that you dont cut the return line. The T in the glacier sytem needs to be 18 inches or longer after the pump, so You kinda need to do some figuring and get it layed out. You can always call Richard from glacier with any questions, if you dont have his # pm me.
 
Thanks for your reply. I didnt recieve the kit untill today and after I read the directions it answered my question. I was just trying to get a head start on the figuring process because I only have a lift and other equipment for a short time. Thanks for your response and if I have any problems Ill call Richard.
 
Status
Not open for further replies.
Back
Top