I am in the process of plumbing the basement bathroom. My house was built in 2004 and has a rough in for the basement bathroom. The rough in is for a system with a sewage ejector pump since the drain line leaving the house to the septic system is higher than the basement slab. I have a cast iron sewage ejector pump ready to go.
My question is about the rubber grommets that are used on the lid to the sewage pit. Are these grommets going to keep the sewer gas in?? Also Should I simply stick the 2" vent pipe through the grommet and not "terminate" it in any way. I am thinking leaving it in about 1" is the way to go but would feel better if I could terminate it solidly somehow. I plan to install my check valve Horizontally any comments?
Last question is with the lid. Do I simply bolt it on using the hardware supplied or should I seal it with RTV. Hoping not to have to get back in very often :-laf
Ho maitenace free are these systems? Any tips or tricks would be appreciated. I am going to add a high level alarm also.
Thanks in advance
My question is about the rubber grommets that are used on the lid to the sewage pit. Are these grommets going to keep the sewer gas in?? Also Should I simply stick the 2" vent pipe through the grommet and not "terminate" it in any way. I am thinking leaving it in about 1" is the way to go but would feel better if I could terminate it solidly somehow. I plan to install my check valve Horizontally any comments?
Last question is with the lid. Do I simply bolt it on using the hardware supplied or should I seal it with RTV. Hoping not to have to get back in very often :-laf
Ho maitenace free are these systems? Any tips or tricks would be appreciated. I am going to add a high level alarm also.
Thanks in advance