Well My expansive shop build is getting closer to being done. It started out as a naked poor , a hallway and sheathed studs. Now with hallway removed , and lam beam installed , 100 amp stand alone service with shop air plumbed in wall and 5 8 foot t-8 quad flourescent lights to go in next. The exterior walls are insulated with a R value of 30 and thermo lined. 5/8ths sheetrock all arround and FRP paneling for a final wall prep. The floor was mechanicly abraded and epoxyshielded. And of course cable , broadband , and home network ports are at hand as well. Two 30,000 BTU heating units are in the entire shop (One per bay) and A/C will be next. Still have a few things to finish (Ceiling taping , lighting and heat but the dream is getting close. Oo. Basicly working on it in spare time , after work , and taking it slow as planning and fabrication is all in my head. (Next to the voices anyhow)
<hr>
This is the epoxyshield applied after the floor was abraded with shot blast.
#ad
<hr>
The Air control center is Plumbed in wall with a seperator. That box lid closes flush and I texture painted it to match the FRP wallboard tecture. The guage sits nicely in the hole for easy pressure monitoring.
#ad
<hr>
This shot shows the Office end of the shop area and on the left side (Just out of picture view) will house the 56" X 42" deep rollaway toolbox bottom. The side shown will have the P/c , and audio / video housed in wall as soon as I get the countertop area done.
#ad
<hr>
This is the view the toolBox will have looking out. The doors will be 2" double insulated units.
#ad
<hr>
This is the epoxyshield applied after the floor was abraded with shot blast.

<hr>
The Air control center is Plumbed in wall with a seperator. That box lid closes flush and I texture painted it to match the FRP wallboard tecture. The guage sits nicely in the hole for easy pressure monitoring.

<hr>
This shot shows the Office end of the shop area and on the left side (Just out of picture view) will house the 56" X 42" deep rollaway toolbox bottom. The side shown will have the P/c , and audio / video housed in wall as soon as I get the countertop area done.

<hr>
This is the view the toolBox will have looking out. The doors will be 2" double insulated units.