This site, besides telling wats the hold on orders, has the build dates. Better known as production change-over to us. Here is the link to the dates for orders (03 cut-off is shown as 4-22) and when you cna order a 04. Knowing its up to DC whenever they REALLY do the change, at least we can plan oround these.
The home page is: www.donlen.com
The order dates are listed here:
http://www.donlen.com/Whats_New/new_buildstart_trucks_daimlerchrysler.html
Hope this helps some of us (and I respectfully credit these to the another poster in another thread).
EDIT: here is one with the Canadian & US list:
http://www.donlen.com/Whats_New/new_frames3.html
\\BF//
The home page is: www.donlen.com
The order dates are listed here:
http://www.donlen.com/Whats_New/new_buildstart_trucks_daimlerchrysler.html
Hope this helps some of us (and I respectfully credit these to the another poster in another thread).
EDIT: here is one with the Canadian & US list:
http://www.donlen.com/Whats_New/new_frames3.html
\\BF//
Last edited: