A trans go will take a long time-id rather not do one,I can,and ive done a few,but they are very time consuming,and Id like to have a way to clean the internal parts as it comes apart. There is also the distraction factor,building VB;s isnt something to be taken lightly,id rather do one when i can devote my total concentration to it,and be able to lay things out on the bench without worry of stuff gettting knocked over,that would be bad. Im not sure i could do that there. A VB swap is so much easier,and tuning is no big deal. The trans go kit took my 6 hrs for the first one,and 5. 5 for the next two,there is a lot of time consuming labor involved. It takes me 1. 5 hrs to get there,3 hrs on the road total,makes a long day,Call DTT,get the VB,ill put it in,,and we'll check your pressures,and tune it if neccesary ,put in the resistor,or voltage adjuster,in about 1-2 hrs. if you want to put in a Mag hytech pan,now is the time. PM me if your interested.