Here I am

DANA 70 with Mag Hytec Cover

Attention: TDR Forum Junkies
To the point: Click this link and check out the Front Page News story(ies) where we are tracking the introduction of the 2025 Ram HD trucks.

Thanks, TDR Staff

Cup holder ad in classifieds

Where is Marco and his ECM bombing??

Status
Not open for further replies.
I just installed one 2 weeks ago and it took about 5-3/4 qts. I did have to file a few high spots and threw some Prematex in some of the numbers and other low spots on the mating surface. No leaks. The only thing I goofed on was forgetting to lube the o-ring before installing. oops! Oh well, I'll order a new o-ring if I ever have to pull the thing off. BTW A tip to remove the existing cover. Forget about trying to pry the thing off. Just take a rubber dead blow hammer and hit it from the side. "Shear" action loosens it right up. Have fun. :rolleyes:

Tom
 
Status
Not open for further replies.
Back
Top