Here I am

How Long Should it Take??

Attention: TDR Forum Junkies
To the point: Click this link and check out the Front Page News story(ies) where we are tracking the introduction of the 2025 Ram HD trucks.

Thanks, TDR Staff

Calling all PA. Members

Update on pusher pump

Status
Not open for further replies.
I will be installing different injectors in my 95 Ram. How much time should I allow, and other than something to pull the old injectors, do I need special tools other than a torque wrench and sockets? I know mechanical aptitude comes into play, so lets just say I'm capable, just not having done this before, a little cautious. Thanks

:eek: :eek: :cool:
 
I would say being careful and taking your time, shouldn't take longer than 4 hours for a first timer. That much time also includes time for a beer or two, cleaning up and putting away the tools.
 
Don't start the swap without a injector puller. You will probably need one if the stock injectors are still in there.



You will also need a 19mm or 3/4" crows foot to tighten the injection lines. Torque should be 22 lb-ft.
 
Status
Not open for further replies.
Back
Top