Here I am

How Many "600" Have We Ordered

Attention: TDR Forum Junkies
To the point: Click this link and check out the Front Page News story(ies) where we are tracking the introduction of the 2025 Ram HD trucks.

Thanks, TDR Staff

So far so good.........

radio/cruise control hum

Status
Not open for further replies.
:D :D



I wanted to get an idea of how many 600 were ordered thru our membership. Basically just get an idea of where I stand in line for mine. The general public does not know anything about the 600 yet. So that gives us a head start. I just placed my order today.
 
Ramrod, mine is to be built January 5th. I was told it would be built on January 2nd but I doubt the factory begins on a Thursday following New Years day. Been without a truck since I sold my 2001 last July, so I am ready!! Good luck on your order.
 
Originally posted by Ramrod

:D :D



I wanted to get an idea of how many 600 were ordered thru our membership. Basically just get an idea of where I stand in line for mine. The general public does not know anything about the 600 yet. So that gives us a head start. I just placed my order today.



YOU DID ?:confused:... hmmm, well I'll bet it was accepted at 2:00pm into chryslers mainframe, and should hit D status on... oh, lets say the 15th, yeah, that sounds about right



haha... by they way 5 and counting (here) to answer your question - one for me just for grins and giggles :D
 
My order went in December 6th. Had it all worked up in late October but held off at the sales guys' advice. The owner said he'd honor the deal if I chose to wait. They say DC now provides an expected deliver date, which he should have by Monday or so. Said it should be about 5 weeks, but I don't think he took into account the 2 week December shutdown...
 
I put down my deposit today and the dealer said they were able to get it in the January build. We'll see. I'll be w/o a truck till for over a month while waiting.



#ad
 
Originally posted by bish777

I ordered on DEC. 4th from tomeygun. Has anyone called dodge and received a vin or build date?



your VIN has been assigned and the truck is in "D" status - "subfirm" for builtdate of second week of january!!
 
I have one coming, I have been waiting a very very long time to order a new truck here in California but realy didn't want to spend that much money on a SO, 5-speed. In other words I have been deviding my time between the TDR website and the dealer.
 
Re: Re: How Many "600" Have We Ordered

Originally posted by tomeygun

YOU DID ?:confused:... hmmm, well I'll bet it was accepted at 2:00pm into chryslers mainframe, and should hit D status on... oh, lets say the 15th, yeah, that sounds about right



haha... by they way 5 and counting (here) to answer your question - one for me just for grins and giggles :D



yeah baby! Were up to six now thanks to another loyal TDR member - thanks dave!!





heck, if there anyone out there that wants to from a group buy :eek: , maybe I could work something out ?!



lets see... . "hey boss, Some guys on the TDR want 20 trucks"

that should go over good,



well I can dream can't I?
 
I ordered mine SEPTEMBER 10, and as of DEC. 05 it went back to BX after being BG for 3 weeks. Dealer said to be built late January, so I guess I got a 600, by luck. So I forgive Chrysler for taking so long. If it is approved for exhaust brake with the Auto. , I really will be happy.

Jim
 
Last edited:
jlockhart, ordered mine 11-3. i DONT think i am getting 04. 5.

after i read what the cutoff date was i figured it would be the "old" version. it was d1 on 11-23. as of 12-9 it is built and "in storage". wasnt that cutoff date 12-10?



any words of wisdom on this tomeygun?



:confused: happy either way.



jim
 
Originally posted by lil red cummins

jlockhart, ordered mine 11-3. i DONT think i am getting 04. 5.

after i read what the cutoff date was i figured it would be the "old" version. it was d1 on 11-23. as of 12-9 it is built and "in storage". wasnt that cutoff date 12-10?



any words of wisdom on this tomeygun?



:confused: happy either way.



jim



sorry to say that if it is built, then it is 100% pre-04. 5



ALL "600"s are scheduled on jan 2nd or later
 
thanks tomeygun.



thats what i figured. i am happy with what i will be getting.



as i stated on another thread, one TST box and i will be way beyond the 04. 5



jim
 
Code BA

Hi all, I ordered my 2004. 5 on Dec 9 and the paper work has a order status code BA ,does any one know what that code is? Thanks in advance.

Wild Bill
 
Status
Not open for further replies.
Back
Top