Can't help you with the PDF at this moment. But I do have a few tips that helped me. When removing the high pressure lines, do not unbolt the clamps that hold them together. This makes it easier to assemble. Remove 1,2,4 as one unit and 3,5,6 as the other. I used a small screwdriver to remove the connector tubes by carefully prying them out with it. Make sure to remove the old copper washer in the bottom of injector hole(if it isn't stuck on the injector) after removing the old injector. A small dap of grease on the new washer will hold it on the new injector when installing. I bought a Snap On CJ143 injector puller and it was worth it in my opinion.