2 of us had our KDPs taken care of bye the Jig method. These were the first ones done by John at JT Diesel in Santee, Ca. .
He was impressed with the Jig and will soon be getting one for his shop. I will inform the Forums when he does, Whilst I am no mechanic, retired wooden boat builder, I felt very confident in his abilities and his attention to detail.
Clean Shop, clean tools and done in about 2 hours for the first one, mine. The second went a bit faster as he was in to the swing of things and eliminated a few steps described in the instruction sheets. Jig is ***aces*** as we used to say on
'thoity thoid and thoid'. We all owe John S. a big THANK YOU for coming up with the design and making kits available to us all.
AHHH, happiness is a KDP fixed, life is good.
dave
He was impressed with the Jig and will soon be getting one for his shop. I will inform the Forums when he does, Whilst I am no mechanic, retired wooden boat builder, I felt very confident in his abilities and his attention to detail.
Clean Shop, clean tools and done in about 2 hours for the first one, mine. The second went a bit faster as he was in to the swing of things and eliminated a few steps described in the instruction sheets. Jig is ***aces*** as we used to say on
'thoity thoid and thoid'. We all owe John S. a big THANK YOU for coming up with the design and making kits available to us all.
AHHH, happiness is a KDP fixed, life is good.
dave