Well my ole' Bronze beauty is finally done... Guys at Six States Distributing were wonderfull... Neat guys to work with... .
They were a little busy but took a total of 2 weeks... . the first week was just waiting for them to get to it... . transmission was on the bench friday... . then from monday to today, (friday) rebuilt it, installed may fast coolers and used the Oil I brought in (redline MTL)... Did the overfill of 1 quart,..... My Dad picked it up and I will get off the road tomorrow but he said it shifts smooth as butter.
Was told by the mechanic that I had the ol style synchros and bearings in my early 01 (built Jan 2000)... they must have redid them for the 02 model because they don't make my older style anymore... . I do have the larger input though...
so if the newer 02 style is better, that would answer why some have no trouble and others have clashing... . curious...
On sunday, going to tow my Rhino on a utility trailer to the mountains... a little weight, a little power, should be just the thing to ease in the new parts... will report nback later...
Any thoughts on how long I should leave this redline MTL in for the first time? I think I ve like 7 quarts in right now with the coolers... .
They were a little busy but took a total of 2 weeks... . the first week was just waiting for them to get to it... . transmission was on the bench friday... . then from monday to today, (friday) rebuilt it, installed may fast coolers and used the Oil I brought in (redline MTL)... Did the overfill of 1 quart,..... My Dad picked it up and I will get off the road tomorrow but he said it shifts smooth as butter.
Was told by the mechanic that I had the ol style synchros and bearings in my early 01 (built Jan 2000)... they must have redid them for the 02 model because they don't make my older style anymore... . I do have the larger input though...
so if the newer 02 style is better, that would answer why some have no trouble and others have clashing... . curious...
On sunday, going to tow my Rhino on a utility trailer to the mountains... a little weight, a little power, should be just the thing to ease in the new parts... will report nback later...
Any thoughts on how long I should leave this redline MTL in for the first time? I think I ve like 7 quarts in right now with the coolers... .