Happy Fourth Gang;
I have a question about my Issopro pyro probe. I have two probes, one I'm going to mount post- and one I'm gonna mount pre-. Now my question is, should I drill and tapa hole or should I get the little brass thingy welded on to the manifold and screw it into it. The Instructions suggest using the weld method, but they only talk about the post-turbo location. Price shouldn't be a concern because I have to either buy a tap or pay a local shop a few bucks to weld it up. Any advice would be helpfull.
Thanks, Josiah
------------------
Y2K 2500, 4X4, Auto, Quad Cab, SWB, 4. 10, Black. VA Box, Line-X, PE Roll top bed cover, Stainless add-ons.
I have a question about my Issopro pyro probe. I have two probes, one I'm going to mount post- and one I'm gonna mount pre-. Now my question is, should I drill and tapa hole or should I get the little brass thingy welded on to the manifold and screw it into it. The Instructions suggest using the weld method, but they only talk about the post-turbo location. Price shouldn't be a concern because I have to either buy a tap or pay a local shop a few bucks to weld it up. Any advice would be helpfull.
Thanks, Josiah
------------------
Y2K 2500, 4X4, Auto, Quad Cab, SWB, 4. 10, Black. VA Box, Line-X, PE Roll top bed cover, Stainless add-ons.