The subject is finishing off the basement.
The basement is mostly underground, maybe 18" above ground. The walls are concrete block. I have not had water in the basement to speak of. What times I have had water there, I know why and have attended to it.
When I bought the house the basement was finished, sort of. 1 X 3 furring strips were nailed to the concrete, 3" side against the concrete. Over that was tinfoil coated tarpater, over that was sheetrock. Some of that was taken down over time. It is now desired to put it back and cover the areas that are not covered.
I am thinking of finishing the areas with 1 X 3's as above, putting plastic over the 1 X 3's for a vapor barrier, sheetrocking and have a nice day.
Am I way off? Do I want / need the vapor barrier? Should I pull it all down and do something else?
Thank You in advance.
Extra bonus question, is pressure treated plywood intended to be used inside the house? I was under the impression that it was for outside use only, due to the chemicals.
Thank You again.
AC
The basement is mostly underground, maybe 18" above ground. The walls are concrete block. I have not had water in the basement to speak of. What times I have had water there, I know why and have attended to it.
When I bought the house the basement was finished, sort of. 1 X 3 furring strips were nailed to the concrete, 3" side against the concrete. Over that was tinfoil coated tarpater, over that was sheetrock. Some of that was taken down over time. It is now desired to put it back and cover the areas that are not covered.
I am thinking of finishing the areas with 1 X 3's as above, putting plastic over the 1 X 3's for a vapor barrier, sheetrocking and have a nice day.
Am I way off? Do I want / need the vapor barrier? Should I pull it all down and do something else?
Thank You in advance.
Extra bonus question, is pressure treated plywood intended to be used inside the house? I was under the impression that it was for outside use only, due to the chemicals.
Thank You again.
AC