I am
I am not controlling anymore. I am just doing reciepts off our products pipeline. We maintain two lines, a NGL line from Douglas WY to Borger TX. Then a products (Propane, diesel, gasoline) from BorgerTX to Denver CO. The propane takeoffs have to be manned.
I am not controlling anymore. I am just doing reciepts off our products pipeline. We maintain two lines, a NGL line from Douglas WY to Borger TX. Then a products (Propane, diesel, gasoline) from BorgerTX to Denver CO. The propane takeoffs have to be manned.