I need to know what interval to retorque the studs on. . It seems like I read on here after the first heat cylce and then one retorque after 100 miles. Is that about right? I also have seen something about marking the nuts and watching to see if they torque past their previous point. Is that correct?
I had the paper that came with the studs but I left it at the machine shop because the ARP studs required the rocker pedestals to be machined for the washer and clearance.
Tell me what you all have been doing.
Thanks
I had the paper that came with the studs but I left it at the machine shop because the ARP studs required the rocker pedestals to be machined for the washer and clearance.
Tell me what you all have been doing.
Thanks