Typically, if there is a lift and an unlimited supply of tools, what can I expect for install time? Also, is anyone running the stainless 1/2 line (150gph) that requires the tank to be drilled? To hook up the coolant lines to the fass yay or nay? (I'm assuming this acts as a fuel heater?)
Thanks!
Thanks!