I have a '03 Bright Silver Metallic Laramie Sport DRW 4X4 ETH/DEE 4:10 all bells and whistles on order. I ordered the truck on 10/4/02. I think the order actually went through on the 7th because of a problem with the color I wanted (graphite). The truck went into D1 status around the 1st of November. It shipped on the 6th and got thru customs at the Port of Laredo on the 9th at 11:13. Made it via UPRR to Salem, IL on the 13th at 15:42 and transferred to CSXT on the 13th at 16:11 bound for Selkirk, NY to be transferred to truck and to my dealer. The Dealer says it should be in this week. It should be, although my 98. 5 was "lost" for a few weeks in Selkirk. So far, everything is on schedule with the DRW (I guess that's my point). the big hold up so far was Customs at Laredo, TX.
Dean