Hello,
Called DC today to get a status on my truck. Yesterday it was in a D1 status with a 7/24/01 ship date, today it's in a E status with a ship date of 7/24/01 (today). How long does it take them to build these things, the girl at DC said it only takes a day or two, is this correct? I can't belive they are working on the frame today and it's gonna go to shipping today..... seems there would be a bit more quality control then that. Any information from those that have ordered and tracked their trucks progress in the past would be appreciated.
Thanks,
Called DC today to get a status on my truck. Yesterday it was in a D1 status with a 7/24/01 ship date, today it's in a E status with a ship date of 7/24/01 (today). How long does it take them to build these things, the girl at DC said it only takes a day or two, is this correct? I can't belive they are working on the frame today and it's gonna go to shipping today..... seems there would be a bit more quality control then that. Any information from those that have ordered and tracked their trucks progress in the past would be appreciated.
Thanks,