Hey guys if everything goes right tomorrow I should have my FASS II waiting for me when I get home from work...
I was thinking up about breaking the installation up into 2 nights, but was wondering if it can be done in a few hours?
I have an extended cab with a short box, so I know installation is going to be a little tougher... I know I read somewhere that I should use a 90-degree fitting for the one fuel line to prevent it from kinking in the future... I was wondering what size and if this would be the only additional fitting I would need? Also is there any special way to route the line to the engine? Do you just zip tie it to the original line or attach it some other way? And finally would taking the rear wheel fender out give me a little more access to the top of the tank...
Any other tips/ideas would be greatly appreciated as well... Thanks...
I was thinking up about breaking the installation up into 2 nights, but was wondering if it can be done in a few hours?
I have an extended cab with a short box, so I know installation is going to be a little tougher... I know I read somewhere that I should use a 90-degree fitting for the one fuel line to prevent it from kinking in the future... I was wondering what size and if this would be the only additional fitting I would need? Also is there any special way to route the line to the engine? Do you just zip tie it to the original line or attach it some other way? And finally would taking the rear wheel fender out give me a little more access to the top of the tank...
Any other tips/ideas would be greatly appreciated as well... Thanks...