I have the final production design completed now! The patent documents are sent. The packaging is almost complete and final pricing will be determined with the manufacturing costs.
I am going out of town Thursday for a Strongman event.
When I return I will get pictures, prices etc posted on a web page link.
Bear with me, some of this stuff takes longer then I expected.
My next post on this will be the RELEASE!
This thing fits all RAMS from 94 and up.
SCOTT
BOMBing takes patience and tolerance.
#ad
I am going out of town Thursday for a Strongman event.
When I return I will get pictures, prices etc posted on a web page link.
Bear with me, some of this stuff takes longer then I expected.
My next post on this will be the RELEASE!
This thing fits all RAMS from 94 and up.
SCOTT
BOMBing takes patience and tolerance.
