Took me and a buddy about two hours plus some beer! My best suggestion would be to prefit everything, then cut the hole. Put the Y-pipe in the bed and then put the stack on and see if you like the position. Then mark the bed and cut away. We used and grinding wheel and it worked very fast. Don't be in a hurry, take your time.