MarkEagleUSA
TDR MEMBER
This is in my buddy's shop as we speak.

That repair looks... um... bad.
This is in my buddy's shop as we speak.
Give's you the momentum to do better
That repair looks... um... bad.
Here's one of the 3 repair sections I'm working on (before some major refinements I did tonight).Give's you the momentum to do better![]()
That repair looks... um... bad.
If anything can be taken away from those pictures, it's the massive crack in the frame from what looks to be a previous attempted repair (1st pic).
Without knowing the full story I'd venture to say it
Kinda reinforces the necessity of doing some pre heating while welding.
I believe JR is referring to thisI'm not seeing a massive crack in that picture. I can see the weld seem of a prior repair, and the seem that appears to be from OEM where the frame transitions, but not any massive crack. As to pre-heat, if it is 50KSI steel or higher, that seems prudent, but I can't find any indication that 50KSI steel was used prior to 2019 on the Dodge/Ram trucks. I'm pretty sure we are looking at standard 36KSI steel on this frame.
If you have other information do let everyone know.
I'm certainly not a metallurgist but from what I've been able to determine is that the 03 frame is not high strength steel, plus the thickness of the frame area to be repaired is .118 and my repair tubing is .120. Not certain but I don't think shrinkage/cracking due to dissimilar metals/thicknesses will be an issue.High carbon steel as a base metal Being welded and varying thickness and type of steel being welded. Both cause large Delta's in the rate of heating and cooling from the weld which causes Shrinkage. Preheating brings both materials up to temp at a more controlled rate and minimizes the delta between the temperature of the weld and steel that would otherwise be at ambient temperature. It's the quick and uneven cooling of two dissimilar metals, plus the tensile strength that causes Shrinkage, and sometimes, cracks.
That repair looks... um... bad.
Thats a very kind speak. It is plain horrible, like made in some third world country. They didn't even clean the surface from rust and everything else prior to welding, the welds are so porous that i hopefully never meet the vehicle in real life!
That example of a repair is the perfect example for a "don't do it like this"!
That wasn't a welder doing this - maybe a barber or a psychologist but not a welder.
Don't worry, it isn't going to pass safety inspection.
That’s the next step. Heavy rains predicted for tomorrow into Saturday will set me back a couple of days.Looks good, now you need to cut out the frame and clean away all paint, rust and debris down to the bare metal to weld properly.
I think I’ll just cut straight in the corner, wrap the ends around on each other, and then weld them.If these are the corners that do not fit, you could cut them like I show on the picture with the white line, then hammer them on end weld the gap.
There are several reasons why preheating is necessary beyond tensile strength. We do R Stamp repairs (Boilermakers) - the list is long why pre and post heat is done during certain repairs. But the ones that pertain to this specific job. High carbon steel as a base metal Being welded and varying thickness and type of steel being welded. Both cause large Delta's in the rate of heating and cooling from the weld which causes Shrinkage. Preheating brings both materials up to temp at a more controlled rate and minimizes the delta between the temperature of the weld and steel that would otherwise be at ambient temperature. It's the quick and uneven cooling of two dissimilar metals, plus the tensile strength that causes Shrinkage, and sometimes, cracks.
I don't have knowledge welding vehicle frames specifically but I'd wager the procedures aren't much different. We are required to follow asme procedures when doing R Stamp work, they exist for a reason. That being said I'm sure most people just glue it up with no ill effects....at least none that they know of![]()