jig time
Hello everyone, Been thinking about this since this thread started. No one on this thread appears to have used a jig so the amount of time to do the job was uncertain for me. Gummel PM'ed about this and I decided I needed to find out just how long this would take. I did the jig yesterday and it took me one hour and twenty seven minutes. Can't tell I kept a close eye on the watch can you? This was from the time I lifted the hood till the time I closed the hood.
Now in all fairness I have to say the time would have been shorter if I had not had to repeat a step or two. For instance, the serpentine (sp) belt needs to be put in place before the Horton fan goes back on the fan mount.
This whole process went just like clockwork otherwise and is just as straight forward as described in many other posts. The air coming from the hole when I drilled, used the countersink and tap, blew chips out very well indeed. Kudos for CPFF for designing this kit.
My tool box is not too extensive, (can you ever have too many tools?) but I had everything I needed.
I am also posting a new thread on the 12V forum on something I found. Maybe check it out. All for now.
Best, John