Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
TDR Magazine subscribers receive more than the magazine! You also gain additional forum privileges!
Details here: TDR Privileges
Subscribe to TDR Magazine here: https://www.tdr-online.com/
Attention: TDR Forum Junkies To the point: Click this link and check out the Front Page News story(ies) where we are tracking the introduction of the 2025 Ram HD trucks.
i would like a set for my 98 and would preffer bolt on. a cage would be nice but not nec. how long do i have to wait to save 300 or so. pm me if need be
I think he is building the type that take 4. 5 months and special steel you have to have shipped in from outer space. Man, it's been a long time for these to come to market.
With the intake horns , and the fuel pump project comming to the end the ladder bars stuff will be next. It takes awhile to get all this stuff done and we have to keep up the transmission stuff as well. The 68 RFE tc stuff got thrown in the mix and we are just done that stuff as well.
Sorry it took so long but they are at the powder coaters. They turned out real nice.
They run a poly bushing in the front and a hiem in the rear. I attach the front of the bars to a cross member. Stay tuned for pics. I will get them up as soon as the powder coater gets them back to me.
We are building set-ups for the second and 3rd gens. Right now I am trying to get quotes on materials, with Bill being extremely picky on what he uses makes my job tuff trying to keep the cost within reason. I will have pics of the set-up that we did for the 3rd gens by the end of the day. Then I can e-mail them to whom ever wants pics. Hopefully someone can post them for me.
For maximum clearance which is what this guys wanted we made the rear weld-on, for those who aren't able to do the weld up rear we will be making a bolt-on kit.
I used high quality material, the heim are all made in USA, enegy suspension bushings, DOM tubing, grade 8 hardware. all brackets are CNC done, no corners cut on this set-up. PM me for pricing if interested.