Here is my personal experience
On 8/17 I ordered my truck (3500, srw, diesel, auto, cc, long bed, 4x4 longhorn trim) I was told at that time by the sales manager expect 16-18 weeks, my salesperson said she has been seeing 14-16 weeks and he was just being cautious. She also told me I should see my vin in a week or two.
On 9/9 I received an email stating they got my vin and shipping eta was 9/20. At that point I was also told once it got on a rail car it would take about 2 weeks to get to the dealer
On 9/20 I got an email stating it had moved to storage to await a rail car
On 9/23 I got an email stating shipping eta was 10/6
I was able to get my build sheet from Ram (not your order build sheet when you place your order at the dealer) on 9/22 so I think it has been built but not positive on that but I think that is generated once it is finished being built. I guess I will believe the eta's when I see my truck. I went to RAM Chat gave them my vin and they told me it was awaiting a rail car. I have not been able to get the build codes (they list where they are in the process) no one seems to want to give them out. And while I have been able to get my build sheet I have not been able to get the Monroney sticker yet, it still comes up Sorry, a Window Sticker is unavailable for this VIN so that tells me the truck has not yet been released from Ram but I also do not know exactly where in the process that happens once it is on the rail car?
Last week I ran across an article stating they were going to close the Saltillo plant (where the 3500's are made)
https://www.detroitnews.com/story/b...grand-cherokee-and-dodge-vehicles/5813699001/
I have not been able to find anything else out about that closure like length of time as the article did not state it. Does this affect me unsure, does it affect your order, don't know but I would assume it would affect every truck that has been ordered but not built yet. If it is like mine and been built(hopefully) does it affect the shipping portion? again no idea.
Here is a list of build codes if you can get the code from Ram or your dealer (which came from a shameless cut and paste from another website called ramforum.com)
BB review by fleet department
BD special equipment processing
BE edit error
BG passed edit n/a for schedule
BGL edit ok parts unavailable
BX passed edit available for schedule
Scheduled:
C sub firm
D firm schedule - dealer has allocation and all parts available
D1 gateline schedule - scheduled to be built
Assembly Line:
E frame
F paint
G trim
Assembly Completed:
I built not ok'd
J built ok'd
JB shipped to body vendor
JE emission check
JS shipped to storage
KZ released by plant , invoiced
Shipping Status:
KZL released - not shipped
KZM first rail departure
KZN first rail arrival
KZO delayed/recieved
KZOA plant holds
KZOB zone/distribution holds
KZOC carrier delays
KZOD carrier holds
KZOE mis-shipped vehicle
KZOF show/test vehicle
KZOG damaged vehicle
KZOH all other reasons
KZT second rail departure
KZU second rail arrival
KZX delivered to dealer
KZY1 - major damage - must not be sold as new
KZY2 - major damage - vehicle sold at auction
ZA canceled
I am just impatiently waiting but it will get here when it gets here