I am lost too. I don't know who is in charge of the location, the communications company or the county. Note the aerial cable and there is a security fence behind the machine, he can only turn 45 degrees to dump the bit. When they finish with the 6' bit they will be about a foot from the wall.
It sounds like they have two options. Pour it full of slurry then redrill and keep doing that until they hit the 22' depth or use a 6'x22' casing and dill inside it or both. The casing is $20k and who knows how far out.
My son grabbed lunch for all of us at A&W, so I was pigging out on that last load and he snuck 7 buckets in on me, I want 5 or 6. About 30k gcw. It dumped really well. I was leery with the front full. The trailer is the 22k PJ. Love those double pumps.
It sounds like they have two options. Pour it full of slurry then redrill and keep doing that until they hit the 22' depth or use a 6'x22' casing and dill inside it or both. The casing is $20k and who knows how far out.
My son grabbed lunch for all of us at A&W, so I was pigging out on that last load and he snuck 7 buckets in on me, I want 5 or 6. About 30k gcw. It dumped really well. I was leery with the front full. The trailer is the 22k PJ. Love those double pumps.