Airdog installations - NOT FOR THE FAINT OF HEART!
Well we FINALLY got this bad boy on. The first night we most spent time going over the instructions and researching what pictures we could find online. THE INSTALLATION TOOK US 9 HOURS - NOT 4. Our hats off to all of you who have been able to walk through the steps without much hassle. This Airdog bucked us ALL THE WAY from start to finish. This morning bright and early we got out and started looking for a good installation point. Our design dictated an outside-the-frame mount in order for the fuel lines to line up correctly. This was a major problem
. There was only one place we could put it - by the emergency brake lever and under the driver's seat. We had to create a spacer out of channel in order to protect the return fuel line. This alone took 2 hours due to the awkwardness and hard-to-get-to hardware locations. After we got this squared away, we had a terrible time getting Dodge's old fuel tank suction line off :{. That took 1 1/2 hours. We finally got the hose itself off and had to work off the so-called "quick connect" with wire cutters. Getting the fuel fittings on the fuel hose was insane. Daniel manhandled it, which worked on 2 fittings. The rest we had to heat the hose in order to get it to slide over the fittings. This took up a lot of time. After we got it all together it took quite a few pumps to the ignition to get the fuel through the lines. After we got the fuel flowing, we still had to loosen some of the injector lines and "eye" if it was getting through. Once we knew the engine was getting the fuel, we cranked a few times and THANK GOODNESS IT TURNED OVER! Oo. If anyone is interested in seeing pictures of this I have left this set public for viewing: Airdog Installation - a set on Flickr
We want to profusely thank everyone for their help. You were all fundamental in helping us get back on the road. God Bless all of you!
Well we FINALLY got this bad boy on. The first night we most spent time going over the instructions and researching what pictures we could find online. THE INSTALLATION TOOK US 9 HOURS - NOT 4. Our hats off to all of you who have been able to walk through the steps without much hassle. This Airdog bucked us ALL THE WAY from start to finish. This morning bright and early we got out and started looking for a good installation point. Our design dictated an outside-the-frame mount in order for the fuel lines to line up correctly. This was a major problem

We want to profusely thank everyone for their help. You were all fundamental in helping us get back on the road. God Bless all of you!